Modernization of the main distribution networks serving the Jato district
Modernization of the main distribution networks:
• expansion of the loading tank from 1000 cubic meters to 20,000 cubic meters
• distribution pipelines in PEAD for a total of 9442 m
• PEAD networks, with diameters between 250 and 110 mm for a total of 121144.8 m
• reconstruction of a section of the supply line starting from the tank: in steel, L = 240 m; DN
1000; sp. 8.8 mm;
Q = 752 ÷ 720 l / s.
Customer: Reclamation Consortium 2 – Palermo
Amount of the works: € 10.500.000,00
Modernization of the main distribution networks:
• expansion of the loading tank from 1000 cubic meters to 20,000 cubic meters
• distribution pipelines in PEAD for a total of 9442 m
• PEAD networks, with diameters between 250 and 110 mm for a total of 121144.8 m
• reconstruction of a section of the supply line starting from the tank: in steel, L = 240 m; DN
1000; sp. 8.8 mm;
Q = 752 ÷ 720 l / s.
Customer: Reclamation Consortium 2 – Palermo
Amount of the works: € 10.500.000,00