Interventions for the hydraulic security of the Vicenza area – Rolling dam along the Timonchio stream in the Municipality of Caldogno (Province of Vicenza)
• 2 clay lamination dams (V ~ 600.000 mc)
• 6 Hydraulic items (a work of installation (floor space 33.00 * 50.00 m * 1.20 m), a work of interconnection, two works of restitution, one for the upper and one for the valley, an overflow spillway, 1 unloading)
• Installation of 4 sluices of the flat type for the gripping work (H = 7,5 m) moved by electric motors and non-salient lifting rods, contained inside the sluice gate itself
• Arrangement of the riverbed with support works of the water level and reinforcements and embankments
• Electrical systems that regulate and manage manufactured goods;
Remote control system and remote control able to detect the status of the controlled components, acquire the values of the pressure flow measurement, etc., and receive and return the commands related to the operation of the motorized valves.
Customer: Veneto Region
Amount of the works: € 24.882.786,00
• 2 clay lamination dams (V ~ 600.000 mc)
• 6 Hydraulic items (a work of installation (floor space 33.00 * 50.00 m * 1.20 m), a work of interconnection, two works of restitution, one for the upper and one for the valley, an overflow spillway, 1 unloading)
• Installation of 4 sluices of the flat type for the gripping work (H = 7,5 m) moved by electric motors and non-salient lifting rods, contained inside the sluice gate itself
• Arrangement of the riverbed with support works of the water level and reinforcements and embankments
• Electrical systems that regulate and manage manufactured goods;
Remote control system and remote control able to detect the status of the controlled components, acquire the values of the pressure flow measurement, etc., and receive and return the commands related to the operation of the motorized valves.
Customer: Veneto Region
Amount of the works: € 24.882.786,00