Laying the pipeline for the interconnection of the Bertesina Moracchino aqueduct systems through Strada delle Casone – Ponti di Debba (Municipality of Vicenza)
Strengthening of the municipal water supply network of the Municipality of Vicenza by laying a new ductile iron aqueduct pipeline with a nominal diameter of 500mm for a longitudinal development of approximately 4430 meters, which runs from the Padana state road 11 towards Padua to the Strada Riviera Berica in the locality of Debba. Along the route are planned:
· Crossing in the sub-bed of the Roggia Caveggiara
· Air crossing on the Bacchiglione river
· Crossing with TOC technology of the A4
Customer: Vicentine Waters
Amount of the works: € 2,350,000.00
Strengthening of the municipal water supply network of the Municipality of Vicenza by laying a new ductile iron aqueduct pipeline with a nominal diameter of 500mm for a longitudinal development of approximately 4430 meters, which runs from the Padana state road 11 towards Padua to the Strada Riviera Berica in the locality of Debba. Along the route are planned:
· Crossing in the sub-bed of the Roggia Caveggiara
· Air crossing on the Bacchiglione river
· Crossing with TOC technology of the A4
Customer: Vicentine Waters
Amount of the works: € 2,350,000.00