New sewerage Castel Madama – Crossing Fosso Empiglione

Construction of the sewage treatment plant in the industrial zone and elimination of obsolete plants in the locality of S. Agostino and Muratelle “, as regards the interference of the Collector No 1 and No 3 with the ditch Empiglione.

Works realized:

· Sewage collector which, having originated from the S. Agostino purification plant, conveys the wastewater that
there they come to the area of ​​productive settlements;

· Sewage collector that originates from the Muratelle purifier and flows into the purifier in the future
above;

· New sewage treatment plant on two twin treatment lines with a capacity of 20000
equivalent inhabitants.

Customer: EDILMOTER S.r.l.

Amount of the works: € 4,500,000.00

Construction of the sewage treatment plant in the industrial zone and elimination of obsolete plants in the locality of S. Agostino and Muratelle “, as regards the interference of the Collector No 1 and No 3 with the ditch Empiglione.

Works realized:

· Sewage collector which, having originated from the S. Agostino purification plant, conveys the wastewater that
there they come to the area of ​​productive settlements;

· Sewage collector that originates from the Muratelle purifier and flows into the purifier in the future
above;

· New sewage treatment plant on two twin treatment lines with a capacity of 20000
equivalent inhabitants.

Customer: EDILMOTER S.r.l.

Amount of the works: € 4,500,000.00