Sewerage network on Via Tiburtina in Rome
Construction of the doubling of the Via Tiburtina sewer in the stretch between Via di Casal Bruciato and the Tiburtino Bridge, and the construction of some new sewer trunks on Via G. Marcotti, Via V. Morello, Via dei Durantini, Via L. Lodi and Via S. Bargellini.
The new GRP drain, with a circular section, has a total development of 954 m divided as follows:
o DN1200 (in traditional): 110 m;
or DN1350 (in traditional): 121 m;
or DN1940 (in traditional): 233 m;
or DN2400 (in traditional): 281 m;
o DN2555 (in microtunneling): 166 m;
o DN2555 (in pipe pusher): 43 m.
Customer: Municipality of Rome
Amount of the works: € 11.948.631,00
Construction of the doubling of the Via Tiburtina sewer in the stretch between Via di Casal Bruciato and the Tiburtino Bridge, and the construction of some new sewer trunks on Via G. Marcotti, Via V. Morello, Via dei Durantini, Via L. Lodi and Via S. Bargellini.
The new GRP drain, with a circular section, has a total development of 954 m divided as follows:
o DN1200 (in traditional): 110 m;
or DN1350 (in traditional): 121 m;
or DN1940 (in traditional): 233 m;
or DN2400 (in traditional): 281 m;
o DN2555 (in microtunneling): 166 m;
o DN2555 (in pipe pusher): 43 m.
Customer: Municipality of Rome
Amount of the works: € 11.948.631,00